Case Study • Domestic
Solar & Battery Installation in Bromley
A domestic solar and battery installation completed alongside a major home renovation, designed to reduce electricity costs and reliance on the national grid.
Location
Bromley
Property Type
Domestic
Installation Date
July 2026
CO2 Savings
527 kg COâ‚‚/year
EST. ANNUAL GENERATION
EST. ANNUAL SAVINGS
CO2 SAVINGS
The Project
The homeowner was carrying out a major renovation and wanted to install solar panels and battery storage while the property was already undergoing extensive building work.
The aim was to reduce electricity costs and become less reliant on the national grid by generating and storing more energy at home.
The installation was completed in two stages. The solar panels were fitted in April while the existing scaffolding was still in place. Once the homeowner was ready for the electrical works in July, we returned to install the inverter and battery before commissioning the complete system.
With costs already mounting from a new kitchen and other renovation work, it was important to choose a system that met the homeowner’s needs without adding unnecessary expense. Sigenergy provided a suitable solution at a reasonable price.
Although the overall project ran over several months, the installation itself was straightforward. By coordinating with the other trades working at the property, we were able to progress the installation with as little inconvenience to the homeowner as possible.
The customer was happy with the completed system and the overall result.
The Challenge
Working Around a Major Renovation
The solar installation needed to fit around a new kitchen and wider building works already taking place at the property.
Phased Installation
The panels were installed while scaffolding was available in April, with the inverter, battery and commissioning completed later in July.
Keeping Costs Under Control
With significant renovation costs already mounting, the homeowner needed a system that met their requirements at a sensible price.
Our Solution
Making Use of Existing Scaffolding
The panels were installed in April while scaffolding from the renovation was already in place.
A Cost-Conscious Sigenergy System
Sigenergy was selected because it suited the homeowner’s requirements while remaining reasonably priced.
Coordinating With Other Trades
We worked alongside the other contractors at the property and scheduled the installation in stages to minimise disruption throughout the renovation.
Before, During and After
Before
The property during the wider home renovation before the solar system was completed.
During
Solar panels being installed while the existing renovation scaffolding was still in place.
After
The completed solar and battery system following installation and commissioning.
SYSTEM SPECIFICATION
System Size
2.79 kW
Number of Panels
6
Panel Make & Model
Aiko Neostar 2S 465W All Black N-Type Mono
Battery Storage
Sigenergy SigenStor 8.76kWh Battery Model 10.0
Inverter Make & Model
Sigenergy SigenStor Energy Controller 8.0kW, Enphase IQ8HC Microinverter with Integrated MC4
Estimated Annual Generation (kWh)
2,545 kWh
Estimated Annual Savings (£)
£677
Estimated COâ‚‚ Savings
527 kg COâ‚‚/year
Additional Equipment
Bird mesh, Renusol mounting kit, smoke alarms and radio bases, Sigenergy Gateway, Enphase IQ Gateway, 4-way fusebox unit, earth electrode equipment.
Additional Works
New 4-way consumer unit, smoke alarms, radio bases and earth electrode equipment.